Type 26 planned till mid 2030’s
Type 26 planned till mid 2030’s Type 26 production is planned to extend into the mid-2030s; a contract for the second batch of five ships is expected to be negotiated in the early 2020s. Production will run at an approximate 24-month drumbeat, with manufacture of ships two and three toRead More →